1 bottle brown paper wine bag


Get 15% off.
Sign Up at Check Out and use coupon code: 15Today
➤ Our 1 Bottle Brown Paper wine bag are made from tough and durable 130 gsm paper.
✔ They include black rope handles.
DIMENSIONS: 42cm x 11cm x 9cm (HxWxD)
PRODUCT CODE: WRSB-WBS
- 1 BAG$0.67